RECENT ADVANCES IN TECHNOLOGY - 1 / SPECIAL STEAM TURBINES

REDUCING THE TIMING TO GET FASTER START UP IN STEAM TURBINES

ADVANTAGES & DISADVANTAGES IN A FASTER START UP IN SPECIAL STEAM TURBINES

Special steam turbines are designed to operate under high-pressure and high-temperature conditions and are used in critical applications such as power generation plants, oil and gas refineries, and petrochemical plants. A faster startup time can help to improve the overall efficiency and availability of the turbine, but there are also some advantages and disadvantages to consider.

Advantages:

  • Faster start-up time can lead to increased availability and faster response to demand.
  • Reduced downtime due to maintenance or repairs, as faster startups can help to reduce the time needed for maintenance.
  • Improved efficiency, as a faster start-up time can help to reduce thermal stresses and improve overall system efficiency.
  • Improved safety, as the turbine can be quickly started up in the event of an emergency.

Disadvantages:

  • Materials limitations, as faster startups can lead to increased wear and tear on critical components such as blades, seals, and bearings.
  • Control system limitations, as the control systems may not be able to handle the rapid changes in temperature and pressure during startup.
  • Water conditions, as the water chemistry must be carefully monitored during startup to prevent corrosion and scaling.
  • Higher thermal stresses on the turbine components, which can lead to fatigue and eventual failure if not managed properly.

To achieve a faster startup time, it is important to consider several factors, including:

  • Design and materials selection: The turbine design and materials used should be able to withstand the increased thermal stresses during startup and operation.
  • Control system design: The control system should be designed to handle rapid changes in temperature and pressure during startup, and to ensure that the turbine is started up safely and efficiently.
  • Water chemistry: The water chemistry should be carefully monitored and controlled during startup to prevent corrosion and scaling, which can lead to damage to the turbine components.
  • Operator training and procedures: Proper training and procedures should be in place to ensure that the turbine is started up safely and efficiently, and to minimize the risk of damage or failure.

LIMITATIONS IN ENGINEERING & DESIGN TO GET A FASTER START UP IN STEAM TURBINES

There are several limits in engineering and design that need to be considered in order to achieve a faster start-up time for special steam turbines. Some of these limits include:

  1. Material limitations: The materials used in the construction of the turbine and associated equipment must be able to withstand the high temperatures and pressures that are encountered during start-up. The choice of materials must be carefully considered to ensure that they are able to withstand the stress and strain of the start-up process.

  2. Control limitations: The control systems used to operate the steam turbines must be able to respond quickly and accurately to changes in the operating conditions. This requires sophisticated control systems that are able to monitor and adjust the operation of the turbine in real-time.

  3. Water conditions: The quality of the water used to generate steam can have a significant impact on the performance of the turbine. Water impurities can cause corrosion and other damage to the turbine, reducing its efficiency and reliability.

  4. Operational limitations: The operating procedures used to start-up the turbine must be carefully designed to minimize the time required to bring the turbine to full operating conditions. This requires a thorough understanding of the turbine’s performance characteristics and the ability to optimize the start-up process.

  5. Safety limitations: The safety of the turbine and associated equipment must be carefully considered during the start-up process. There are numerous hazards associated with the start-up process, including the potential for fires, explosions, and other accidents. It is important to have robust safety protocols in place to minimize the risk of these types of incidents.

Overall, achieving a faster start-up time for special steam turbines requires a careful balance of engineering, design, and operational considerations. The limitations outlined above must be carefully considered in order to optimize the start-up process and minimize the risk of critical failures and unscheduled shutdowns.

WHY, WHERE, WHEN TO REDUCE TIMING IN START UPS IN STEAM TURBINES

Faster start-ups in special steam turbines can be applied in situations where there is a need to reduce downtime and increase the availability of power generation plants, oil, gas and petrochemical plants. This may be necessary in situations where the plant experiences frequent unplanned outages, or where there is a need to meet peak power demand quickly.

The benefits of faster start-ups include improved reliability, maintainability, and availability of the plant, as well as improved safety due to reduced downtime and reduced risk of critical failures. Additionally, faster start-ups can lead to increased efficiency and reduced costs.

However, it is important to note that faster start-ups may also increase the risk of certain issues such as thermal stresses, vibration, and material fatigue, which could potentially lead to critical failures and unscheduled shutdowns. Therefore, it is important to carefully consider the engineering and design aspects, as well as the materials, controls, and water conditions, in order to ensure safe and reliable operation of the steam turbine during faster start-ups.

In general, the decision to apply faster start-ups should be based on a thorough analysis of the plant’s needs and capabilities, as well as a comprehensive risk assessment that takes into account the potential benefits and risks of faster start-ups. It is also important to follow established procedures and best practices for steam turbine operation, maintenance, and repair, in order to ensure optimal performance and avoid critical failures and unscheduled shutdowns.

PROCEDURES, ACTIONS, STUDIES, RECOMMENDATIONS FOR A FASTER START-UP IN STEAM TURBINES

Here are some procedures, actions, studies, and recommendations that can be applied in order to achieve faster start-ups in special steam turbines:

  1. Conduct a thorough analysis of the plant’s operational and control systems to identify potential bottlenecks and areas for improvement.

  2. Review the manufacturer’s recommended procedures for starting up the steam turbine and compare them with the plant’s existing procedures.

  3. Develop and implement a comprehensive maintenance program to ensure that all critical components, including valves, bearings, and seals, are properly maintained and in good working order.

  4. Consider upgrading the control system to allow for more efficient and effective start-up sequences.

  5. Install auxiliary equipment, such as preheaters and heat exchangers, to improve the temperature and pressure of the steam entering the turbine.

  6. Evaluate the quality and quantity of the plant’s water supply, as water conditions can have a significant impact on steam turbine start-up times.

  7. Conduct simulations and modeling studies to identify potential improvements to the steam turbine’s design and operation that could reduce start-up times.

  8. Train plant personnel in best practices for steam turbine start-up procedures and ensure that they have the necessary skills and knowledge to carry out these procedures effectively.

By implementing these procedures and actions, and conducting the necessary studies and evaluations, it is possible to achieve faster start-ups in special steam turbines and improve their reliability, maintainability, availability, and safety while avoiding critical failures and unscheduled shutdowns.

CRITICAL RISKS IN CASE OF FASTER START-UP IN SPECIAL STEAM TURBINES

There are several critical risks that should be considered when trying to achieve faster start-ups in special steam turbines:

  1. Material Risks: The materials used in the construction of the steam turbines may not be able to handle the high temperatures and pressures associated with a fast start-up. This could result in material failure and the need for costly repairs.

  2. Control Risks: The control systems used to manage the start-up process may not be able to respond quickly enough to changes in the system. This could result in the turbine not starting up properly or even damaging the turbine.

  3. Water Risks: The quality and availability of water used in the steam turbine can have a significant impact on its performance. If the water is not of the right quality, it can cause corrosion, scaling or other issues that can impact the reliability and performance of the turbine.

  4. Mechanical Risks: The mechanical components of the steam turbine can also be affected by fast start-ups. The increased stress and strain on the components can cause wear and tear that can lead to failures and unscheduled shutdowns.

  5. Safety Risks: Faster start-ups can increase the risks of accidents, especially if safety procedures are not followed properly. It is important to ensure that safety procedures are in place and that personnel are trained to follow them.

In order to mitigate these risks, it is important to conduct thorough risk assessments and implement appropriate mitigation strategies. This may include using materials that are designed to handle higher temperatures and pressures, upgrading control systems, ensuring water quality, conducting regular maintenance and inspections, and providing appropriate safety training and procedures for personnel.